Entries in Failure Analysis (3)

Monday
Sep162019

Managing High Availability in PostgreSQL – Part III: Patroni

Managing High Availability in PostgreSQL – Part III: Patroni - ScaleGrid Blog

In our previous blog posts, we discussed the capabilities and functioning of PostgreSQL Automatic Failover (PAF) by Cluster Labs and Replication Manager (repmgr) by 2ndQuadrant. In the final post of this series, we will review the last solution, Patroni by Zalando, and compare all three at the end so you can determine which high availability framework is best for your PostgreSQL hosting deployment.

Patroni for PostgreSQL

Click to read more ...

Tuesday
Apr162019

MySQL High Availability Framework Explained – Part III: Failover Scenarios

MySQL High Availability Framework Explained – Part III: Failover Scenarios

In this three-part blog series, we introduced a High Availability (HA) Framework for MySQL hosting in Part I, and discussed the details of MySQL semisynchronous replication in Part II. Now in Part III, we review how the framework handles some of the important MySQL failure scenarios and recovers to ensure high availability.

MySQL Failover Scenarios

Scenario 1 – Master MySQL Goes Down

  • The Corosync and Pacemaker framework detects that the master MySQL is no longer available. Pacemaker demotes the master resource and tries to recover with a restart of the MySQL service, if possible.
  • At this point, due to the semisynchronous nature of the replication, all transactions committed on the master have been received by at least one of the slaves.
  • Pacemaker waits until all the received transactions are applied on the slaves and lets the slaves report their promotion scores. The score calculation is done in such a way that the score is ‘0’ if a slave is completely in sync with the master, and is a negative number otherwise.
  • Pacemaker picks the slave that has reported the 0 score and promotes that slave which now assumes the role of master MySQL on which writes are allowed.
  • After slave promotion, the Resource Agent triggers a DNS rerouting module. The module updates the proxy DNS entry with the IP address of the new master, thus, facilitating all application writes to be redirected to the new master.
  • Pacemaker also sets up the available slaves to start replicating from this new master.

Thus, whenever a master MySQL goes down (whether due to a MySQL crash, OS crash, system reboot, etc.), our HA framework detects it and promotes a suitable slave to take over the role of the master. This ensures that the system continues to be available to the applications.

Scenario 2 – Slave MySQL Goes Down

  • The Corosync and Pacemaker framework detects that the slave MySQL is no longer available.
  • Pacemaker tries to recover the resource by trying to restart MySQL on the node. If it comes up, it is added back to the current master as a slave and replication continues.
  • If recovery fails, Pacemaker reports that resource as down – based on which alerts or notifications can be generated. If necessary, the ScaleGrid support team will handle the recovery of this node.
  • In this case, there is no impact on the availability of MySQL services.

Scenario 3 – Network Partition – Network Connectivity Breaks Down Between Master and Slave Nodes

This is a classical problem in any distributed system where each node thinks the other nodes are down, while in reality, only the network communication between the nodes is broken. This scenario is more commonly known as split-brain scenario, and if not handled properly, can lead to more than one node claiming to be a master MySQL which in turn leads to data inconsistencies and corruption.

Let’s use an example to review how our framework deals with split-brain scenarios in the cluster. We assume that due to network issues, the cluster has partitioned into two groups – master in one group and 2 slaves in the other group, and we will denote this as [(M), (S1,S2)].

  • Corosync detects that the master node is not able to communicate with the slave nodes, and the slave nodes can communicate with each other, but not with the master.
  • The master node will not be able to commit any transactions as the semisynchronous replication expects acknowledgement from at least one of the slaves before the master can commit. At the same time, Pacemaker shuts down MySQL on the master node due to lack of quorum based on the Pacemaker setting ‘no-quorum-policy = stop’. Quorum here means a majority of the nodes, or two out of three in a 3-node cluster setup. Since there is only one master node running in this partition of the cluster, the no-quorum-policy setting is triggered leading to the shutdown of the MySQL master.
  • Now, Pacemaker on the partition [(S1), (S2)] detects that there is no master available in the cluster and initiates a promotion process. Assuming that S1 is up to date with the master (as guaranteed by semisynchronous replication), it is then promoted as the new master.
  • Application traffic will be redirected to this new master MySQL node and the slave S2 will start replicating from the new master.

Thus, we see that the MySQL HA framework handles split-brain scenarios effectively, ensuring both data consistency and availability in the event the network connectivity breaks between master and slave nodes.

This concludes our 3-part blog series on the MySQL High Availability (HA) framework using semisynchronous replication and the Corosync plus Pacemaker stack. At ScaleGrid, we offer highly available hosting for MySQL on AWS and MySQL on Azure that is implemented based on the concepts explained in this blog series. Please visit the ScaleGrid Console for a free trial of our solutions.

Tuesday
Jul242007

Major Websites Down: Or Why You Want to Run in Two or More Data Centers.

A lot of sites hosted in San Francisco are down because of at least 6 back-to-back power outages power outages. More details at laughingsquid. Sites like SecondLife, Craigstlist, Technorati, Yelp and all Six Apart properties, TypePad, LiveJournal and Vox are all down. The cause was an underground explosion in a transformer vault under a manhole at 560 Mission Street. Flames shot 6 feet out from the manhole cover. Over PG&E 30,000 customers are without power. What's perplexing is the UPS backup and diesel generators didn't kick in to bring the datacenter back on line. I've never toured that datacenter, but they usually have massive backup systems. It's probably one of those multiple simultaneous failure situations that you hope never happen in real life, but too often do. Or maybe the infrastructure wasn't rolled out completely. Update: the cause was a cascade of failures in a tightly couples system that could never happen :-) Details at Failure Happens: A summary of the power outage at 365 Main. It's just these sorts of emergencies that make us think. How would You handle a similar failure? How can you make your website span more than one data center? Is the cost of putting in all this infrastructure worth it compared to your website being down for a day? All good hard to answer and even harder to implement questions. Geo-distributed clustering is not easy, which is why most companies don't do it, but for some help distributing your website take a look at http://highscalability.com/tags/geo-distributed-clusters.

Click to read more ...